Five Year Summary of Completed PTS Design Projects and Project Management Responsibilities:
-
Approximately $800 Million Dollars in Capital Projects Managed to Completion by PTS
-
Twelve (12) Green Field Facilities of 400,000 Square Feet or Larger for Injection Molding, Blow Molding, Filling and Packaging
-
Thirty Six (36) High Speed Reheat Blow Molding and Filling Lines
-
Seventy One (71) High Speed Blow Molding Lines
-
Thirty Five (35) Extrusion Blow Molding Lines
-
Approximately 2.25 Million Bottles Per Hour in Total Production Capacity
-
Fifty Five (55) High Capacity Injection Systems
-
Seventy Two (72) High Pressure Compressed Air Systems at a Total of 54,225 horsepower; over 50% of the existing high pressure centrifugal compressors installations for the PET industry in North America
-
Twenty Six (26) Central Ammonia and HFC Chiller Systems at a Total of 19,000 Tons of Refrigeration
-
Thirty Five (35) Central Cooling Tower Systems at a Total of 42,000 Tons
-
Twenty Six (26) Material Handling Systems at a Total of 71,400 Pounds Per Hour of Resin